Build a modular harbor with a coastal cargo ship, warehouse, box-fold crane, cargo containers and port approach. The 100 mm tiles connect to the SAC City grid. The 10-page PDF includes assembly views and print-scale calibration.
Print at Actual Size / 100% on A4 cardstock. Print the water tile three times. This is a digital print-test edition and physical fit testing is pending. The cover is a concept illustration.





Reviews
There are no reviews yet.